GreenLab lot A10

Lot A10 - In operation

This lot is occupied by Eurowind Energy and their 44 MWh Battery Energy Storage System (BESS) facility.  

The battery will be integrated into GreenLab’s infrastructure and the directly connected hybrid energy park, which already combines 84.8 MW of wind and solar power with an annual production of 200-220GWh. 

The new BESS will play an important role in GreenLab’s integrated energy system. It will help balance the variable production from wind and solar with the energy consumption of the industries located in the park. In practice, that means it enables peak shaving, allowing industries in GreenLab to shift their energy demand away from high-load periods. This results in a more stable and efficient local energy system where green power is used where and when it’s needed most. 

Public planning and regulations

Zone status
Urban Zone
GreenLab local plan
Download
Skive Municipal plan (extract)
Download

Commencement and termination

Termination notice landlord
24 months
Termination notice lessee
12 months
Fixed time period of no exit; landlord
30 years
Fixed time period of no exit, lessee
TBA

Lease Terms and payments in addition to lease

Annual adjustment of lease payment*
Leasee
Property taxes
Leasee
Insurance
Leasee
Deposit*
Leasee
GreenLab Community fee
Leasee
Outdoor maintenance and cleaning of site/building
Leasee
Winter maintenance community roads
GreenLab Community
Indoor maintenance of site/building
Leasee
Indoor cleaning of site/building
Leasee
Waste collection agreement
Leasee

Unique Green Utility supply available

Power (0.4- 20 kVac)
GreenLab SymbiosisNet
Heat*
TBA
Demineralised water
Yes
Process water*
Yes
Nitrogen
Yes
Process air
Yes
Hydrogen
TBA